|
|
| Nazareth Maintenance & Central Warehouse Facility |
 |
 |
 |
 |
 |
 |
 |
|
|
|
|
|
Client: Nazareth Area School District
Address: One Education Plaza, Nazareth, PA 18064
Project Location: 362 Tatamy Road, Upper Nazareth Township, Northampton County, PA
Reference: Dr. Victor Lesky, Superintendent
Category: Support Facility – Public School
Construction Start Date: June 2006
Completion Date: May 2007
Project Area New: 21,000 sq. ft.
Total Project Cost: $4,560,666.00 (including site development & soccer field extra)
Cost per Square Foot: $217.18 / sq. ft.
Design Team:
Civil Engineer: Medina Consultants, Bethlehem, PA
District Engineer: D’Huy Engineering, Inc, Bethlehem, PA
Mechanical, Electrical & Fire Protection Engineers: Snyder Hoffman Associates, Bethlehem, PA
Structural Engineer: D’Huy Engineering, Inc, Bethlehem, PA
Contractors:
General Contractor: Rizzetto Construction, Schnecksville, PA Contract Amount: $3,175,074.
Electrical Contractor: Wind Gap Electric, Wind Gap, PA Contract Amount: $691,392.
HVAC Contractor: Dual Temp Co, Allentown, PA Contract Amount: $478,200.
Plumbing Contractor: Dual Temp Co, Allentown, PA Contract Amount: $216,000.
Project Description:
As part of the Nazareth Area School District long term capital project plan, Architecture FURST PC prepared the design for a new district Maintenance & Central Warehouse Building. The new 21,000 square foot facility includes a central office for the Maintenance and Food Service Departments. It also includes a central warehouse, parts department, bulk refrigeration and freezer for district wide purchasing and storage. Another wing of the building includes a 4 bay garage capable of storing and maintaining up to 12 full size vehicles and lawn care equipment. A HVAC and carpentry shop allows the district to perform maintenance and repairs on various types of district furniture and equipment. |
| Contact Architecture FURST today or call 610-332-3600. |
|